ANNEX 2.
SYSTEM:
CUSTOMER:
FIRST PERFORMER:
SECOND PERFORMER:
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Following the test it is hereby declared that:
The entire system was visually checked to make sure that all the connections have been made in accordance with the
best working standards.
The system was tested internally in n. ______ sections (each test section must be ≤ 100 litres / 0.1 m
3
)
• Test aeriform fluid used:
• Aeriform fluid temperature =
• Room temperature =
• Temperature difference ∆T =
air
nitrogen
_____ °C
_____ °C
_____ °C (must be ≤ 10 °C)
______________________
Preliminary test
Test Pressure =
_____ bar
(must be = 150 mbar)
Duration of the test =
_____ minutes
(must be ≥ 120 minutes)
The ducts are watertight (∆p = 0)
Main test
Test pressure =
_____ bar
(must be ≤ 3 bar for DN ≤50 and ≤ 1 bar for DN >50)
Duration of the test = _____ minutes
(must be ≥ 30 minutes)
The ducts are watertight (∆p = 0)
Place
_______________________________
Date
_______________________________
Signature of the customer or representative:
____________________________________
Signature of the first performer or representative:
____________________________________
Signature of the second performer or representative:
____________________________________