ANNEX 3.
SYSTEM:
CUSTOMER:
PERFORMER:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Following the test it is hereby declared that:
The entire system was visually checked to make sure that all the connections have been made in accordance with the
best working standards.
The pipework has been completely aired out.
The operating pressure equals 10 bar.
• Water temperature =
• Room temperature =
• Temperature difference ∆T =
_____ °C
_____ °C
_____ °C (must be ≤ 10 °C)
Pressure test at room temperature
Operating pressure =
Test Pressure =
(Operating pressure x 1,3)
_____ bar
_____ bar
_____ minutes
The ducts are watertight (∆p = 0)
Duration of the test =
(must be ≥ 30 minutes)
Pressure test in temperature
(to be carried out immediately afterwards)
Max operating temperature =
Test Pressure =
(Operating pressure x 1,3)
_____ °C
_____ bar
_____ minutes
The ducts are watertight (∆p = 0)
Duration of the test =
(must be ≥ 30 minutes)
Place
_______________________________
Date
_______________________________
Signature of the customer or representative:
_______________________________
Signature of the performer or representative:
_______________________________
Manuale Tecnico [profilo M]
64
Technical Guide [M-Profile]