modules can be combined as required
with 11⁄2" union nut for assembly on PAW distribution manifolds
with PAW mounting equipment, the HeatBloCs can be installed on wall
brackets
easy handling, visible closing position
EPP, complete insulation of the valves and fittings with sealing lips,
ventilation opening to cool the pump
can be opened, 200 mm wc, spring-loaded, thus suited for horizontal and
overhead installation
The HeatBloC®s can be delivered with flow on the left against additional
charge.
also for heating circuits with mixing valve
can be pulled off, with immersion sleeve integrated in the ball valve
fitted with 2 m cable, completely premounted, integrated in the
insulation, pressure tested, with serial number, perfectly designed system,
pump characteristics, EuP/ErP READY
so that it can be replaced without draining
As of page 117, you will find the complete mounting equipment for the
modular system DN 25.
D
N
2
5
01/2020 • Printed in Germany
104
PAW GmbH & Co. KG • 31789 Hameln • Germany • Phone: +49-5151-9856-0 • Fax: +49-5151-9856-98 • info@paw.eu • www.paw.eu