modules can be combined as required
Including 1" union nut for assembly on a PAW distribution manifold.
With PAW mounting equipment the HeatBloCs can be installed on wall
brackets.
easy handling, visible closing position
made of durable elastic EPP, complete insulation of valves and fittings,
ventilation opening to cool the pump
the insulation for the distribution manifold is integrated in the heating
circuit insulation
can be opened, 200 mm wc, spring-loaded, thus suited for horizontal and
overhead installation
The HeatBloC®s can be delivered with flow on the left against additional
charge.
also for heating circuits with mixing valve
can be pulled off, with immersion sleeve integrated in the ball valve
fitted with 2 m cable, completely premounted, integrated in the
insulation, pressure tested, with serial number, perfectly designed system,
pump characteristics, EuP/ErP READY
so that it can be replaced without draining
As of page 93, you will find the complete mounting equipment for the
modular system DN 20.
D
N
2
0
01/2020 • Printed in Germany
86
PAW GmbH & Co. KG • 31789 Hameln • Germany • Phone: +49-5151-9856-0 • Fax: +49-5151-9856-98 • info@paw.eu • www.paw.eu