SUGGESTED PLANT
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
DEGREASER
(DG / DG-PRO)
COMPOSIZIONE IMPIANTO
FINAL DRAINAGE
SCA
P
R
U
I
B
C
L
O
IC
F
S
I
E
N
W
A
ER
LE
Table 3
DEGREASER
(DG / DG-PRO)
+
IMHOFF TANK
(a)
+
+
+
+
+
+
+
+
+
+
+
+
+
+
DEGRASSATORE
IMHOFF
(a)
PERCOLATORE
ANAEROBICO
FILTRO
PERCFIOLTLARTOORE
IMHOFF
IMHOFF
IMHOFF
IMHOFF
BIOLOGICAL
TANKDEGRASSA
+TORE
DEGRASSATORE
TANK
(a)
+
DEGRASSATORE
DEGRASSATORE
BIOLOGICAL TREATMENT
THROUGH LOW LOAD
BI-CAMERAL
CORSO D’ACQUA
Tabella 3
SEPTIC TANK
TRI-CAMERADLEGRASSATORE
THROUGH EXTENDED
VASCA
IMHOFF
VASCA
DRIVEN SECONDARY
TREATMENT
VASCA
IMHOFF
(a)
ANAEROBIC
PERCOLATING FILTER
(FAN)
TRATTAMENTO
(g)
(g)
AERATION ACTIVATED
SLUDGE (FOT)
(a)
SECONDARIO
TRATTAMENTO
(a)
(a)
PERCOLATING FILTER
IM(VFHAONSFC) FA
(a)
IMHOFF
(a)
AEROBIC PERCOLATING
(b)
SECONDARIA
(c)
FAANEGRHOIBAICTOTIVI A
DEGRASSATORE
FILTRO
COVMASPCAOSIZIONE IMPIANTO
(f)
SCARICO FINALE
SEPTIC TANKDEGRASSATORE
VASCA
IMVHAOSFCFA
(a)
SETTIC
SECONDA
BASSO CARICO
CORSO D’ACQUA
(f)
Tabella 3
SUB-IRRIGATION
Table 3
SCARICO SU SUOLO
(f)
Tabella 4
SCARICO SU SUOLO
(f)
D R A I N O
TN
a
Tb
He l
El
a
G4
R O U N D
( e )
Table 4
(a)
(a)
PERCOLATORE
ANAEROBICO
(c)
IMHOFF
AEROBICO
(b)
FILTRO
A
ANAEROBIC
VASCA
SETTICA
+PIEMRPCIOALNAETXOPRAUELSION GULLY
FILTEVRA(SFCAAE)
VASCA
(a)
IMHOFF
(a)
+
SEPTIC
P R O C E S S O( F
S
B
S
CI
D
) A
Z I
O N E T
O T
A
L E
IMHOFF
(a)
DEPURAZIONE
(d)
PHYTO-DIEMPPUIRAANTIONA FANGHI ATTIVI AD
OSSIDAZIONE TOTALE
(b)
FANGHFITAOT-TIVI A
(d)
(c)
DBEAPSUSROACZAIORNICEO
A
C T I V
A
T
VI
EMAD
PS
SCI
A
AL
NU
T
D
O
G
AE F A
N G H
I A
T
FT
I
I
TV
OI -
A
D
IMHOFF
IMPIANTO A
SECONDARY
TANK
(a)
+
DEGRASSATORE
E
TANK
+
DEGRASSATORE
TREATMENT
(d)
(a)
IMHOFF
IMHOFF
IMHOFF
IMHOFF
IMHOFF
IMHOFF
IMHOFF
(a)
SECONDARIO
DEGRASSATORE
TANK
(a)
+
DEGRASSATORE
TANK
(a)
+
DEGRASSATORE
SECONDARY
TREATMENT
(f)
VASCA
IMHOFF
(a)
TRATTAMENTO
SECONDARIO SPINTO
TRATTAMENTO
SECONDARIO SPINTO
IRRIGATION
Table 4
IRRIGAZIONE
Tabella 4
IRRIGAZIONE
(h)
Tabella 4
(g)
(h)
TANK
(a)
TANK
(a)
TANK
TANK
(a)
+
+
AEROBIC PERCOLATING
SECONDARY
(e)
ELBI S.p.A. – Amminist
(
r
b
a
)
zione e stabi
+
limento: Via Buccia, 9 – 350
(c
1
)
0 LIMENA (PD) – Partita I.V.A. 00838770287
STREAM
FILTER (FAE)
SEPTIC
Table 3
Tel. 049 8840677 – Fax Commerciale 049 8841610 – Fax Amministrativo 049 769675 – Internet:
http://www.elbi.it – E-mail: info@elbi.it
Stabilimento e deposito: Via delle Magnolie – 70026 MODUGNO (BA) – Tel. 080 5316843 – Fax 080 5316822
(a)
BIOLOGICAL TREATMENT
+
THROUGH LOW LOAD
2/3
ELBI S.p.A. – Amministrazione e stabilimento: Via Buccia, 9 – 35010 LIMENA (PD) – Partita I.V.A. 00838770287
ACTIVATED SLUDGE
Tel. 049 8840677 – Fax Commerciale 049 8841610 – Fax Amministrativo 049 769675 – Internet:
http://www.elbi.it – E-mail: info@elbi.it
PROCESS (FBC)
Stabilimento e deposito: Via delle Magnolie – 70026 MODUGNO (BA) – Tel. 080 5316843 – Fax 080 5316822
+
PHYTO-DEPURATION
(d)
2/3
TREATMENT
SLUDGE (FOT)
BIOLOGICAL
THROUGH EXTENDED
AERATION ACTIVATED
a) Imhoff tanks are usually preferred instead of septic tanks. Check local ordinances before the installation of septic tanks as they could be only allowed in case of replacement within existing
plants or if required by local government.
b) The outlet of the aerobic percolating filters is fitted on the bottom of the tanks. In case of no slope to allow washing off the filter, it is recommended to uplift the sewage liquid in order to force
its drainage.
c) The outlet of the aerobic percolating filters is fitted on the bottom of the tanks. Solid particles flow away spontaneously. It is recommended to install after the aerobic percolating filters an
additional septic tank in order to avoid that solid particles may contaminate the environment.
In case of drainage directly on soil, the secondary septic tank must be installed also after anaerobic filters.
d) When phytodepuration is carried out after degreaser and imhoff tanks an absorption area of 4/6 m2/E.P. is required.
In case of phytodepuration as refining tertiary system an absorption area of 1 m2/E.P. is required
e) A stream must guarantee at least 120 days p/year of water flow. If this flow is not ensured, the final outlet has to be considered as wastewater on soil
f) For secondary treatment systems, please contact us.
g) For system with final destination as irrigation, please contact us.
N.B. Prior to installation, always contact the local responsible for obtaining the necessary permits for the dumping of the waste.
105
A
RI
N
O
T
E
T
E
C
N
I
C
H
E
T
R
A
T
T
A
M
E
N
T
O
A
C
Q
U
E